Black BLK-IPE101 Manual de usuario Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 34
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
13H.264 Network Video Encoder
SECTION 2: INSTALLATION AND SETUP
To connect a sensor to the encoder:
1. Route sensor wiring to the encoder.
2. Strip 1/4” of insulation from one sensor’s sense and ground wires and insert them into the upper
terminal block in the DI ch 1 and DI GND pin locations, respectively.
3. Strip 1/4” of insulation from another sensors sense and ground wires and insert them into the
upper terminal block in the DI ch 2 and DI GND pin locations, respectively.
2.7.3 Digital out (DO) connection
The encoder supports up to two digital out connections to reporting devices in the conguration shown in
the schematic below.
Digital out wiring schematic
To connect digital out reporting device to the encoder:
1. Route leads from the digital out devices to the encoder.
2. Strip 1/4” of insulation from one device’s signal and ground wires and insert them into the lower
terminal block in the DO ch 1 and DO GND pin locations, respectively.
3. Strip 1/4” of insulation from another device’s signal and ground wires and insert them into the lower
terminal block in the DO ch 2 and DO GND pin locations, respectively.
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 33 34

Comentarios a estos manuales

Sin comentarios